Real assignment · Client anonymized
Four factories. One production plan.
1,000 air fryers. A 12-day production window.
The work
Capacity was divided. Control was not.
- 10+ screenedCooperation and capacity came first.
- 4 allocatedEvery factory received the same requirements.
- TraceableFactory and batch IDs stayed with the goods.
Outcome: production completed within the 12-day window.
Your order